STEVENS ARCHITECTS
  • About
  • Firm Leaders
  • Projects
    • Educational
    • Industrial
    • Commercial
    • Religious
  • City of Port Huron Concept 2009
  • Projects in our Office
  • In the News
    • CAM Magazine Special Issue 2013
    • Masonry Edge
  • Contact
Yanfeng USA Automotive Trim Systems  
Kansas City, Missouri


Square Footage: 250,000

The facility design began in April 2013 and equipment installation began in November 2013.  The building uses auger-cast piling for the foundation system, load-bearing tilt-up precast concrete walls and a structural steel frame roof.  Interior framing also features almost 20,000 sq. ft. of concrete mezzanine supported by composite steel framing.  A 45Ton capacity overhead crane is also supported through 500 feet of processing area. 

Owners Representative: The Cummins Group
Structural Engineer: Professional Engineering & Construction Services
Back
Powered by Create your own unique website with customizable templates.